Showing posts with label cardigan. Show all posts
Showing posts with label cardigan. Show all posts

Wednesday, 15 May 2013

works in progress

It’s nearly the middle of the month and I’m way behind with some of my projects but right on target with others.

No progress has been made in turning a flimsy into a finished quilt for Gift of Hope quilt #2 or in completing the flimsy of my Scrappy Log Cabin quilt.

There has also been no further progress on my Earth and Sky quilt – I plan to rectify that today! As my friend Debbie at Stitchin’ Therapy said in a recent post: “boredom leads to UFOs” and I am so over this project! (Some self discipline is what is needed here! Who me?)

I had some time over the weekend for some knitting and some further time yesterday afternoon so Emily’s Blanket is moving along – slower than I had hoped but still progressing. The colours in the photo below are not accurate but they’re the best I could do – the yellow is much more lemon and doesn’t look so obvious!
2013-05-15 Emily's blanket
Until Emily’s Blanket is finished, I can’t work on the sleeves for my Westall cardigan so it may be a travelling project (ten more sleeps until Airplane).
2013-05 westall cardigan body complete
My hexagon project bag is coming along well and, I hope, right on target. I finished the hand-piecing in class on Monday. I would have finished it over the weekend but I didn’t take the pattern away with me and I had six hexagons I didn’t know what to do with. Turns out they were surplus to need! Ah well, there’s always another project, right?

Anyway, here is the project as it was when I finished class on Monday after the piecing was completed and some of the papers removed. The other photo shows the fabric I have chosen for the lining; the lining has been cut and the two pieces (not shown here) are ready to be gathered and joined. The base of the bag has lots of green in it so the lining makes more sense if you could see it!
piecing finishedlining fabric
I hope to get it completed in class next week. I’d like it done before we go away on 24th May!

I do have plans for another hand-piecing project but that will be the subject of another post.

The biggest project of all, the renovation of DD’s former home, is almost complete. The painter is there but there are still a few odd jobs (mostly that WM had to attend to) to be completed before we call it done – such as ordering a skip (and filling it of course), painting the garage (I’d forgotten about that and have lost enthusiasm now – we decided not to pay the painter to do this “simple” task), washing of floors and hanging of curtains.

Here are some photos of some of the work that has been done:
stove areanew vent in dining roomlaundry tublaundry floorlaundry after shelf removalfamily room after cleaning
  1. A new stove top and oven were professionally installed. WM replaced the doors and handles on either side of the oven. I scrubbed the tiles at the back and cleaned the glass of the range hood. MIL washed the filters before I re-installed them.
  2. WM installed a new vent where there hade been a hole covered by a sheet of MDF held up with duct tape.
  3. When DD and SIL moved in, the laundry tub was covered in paint. It had always been their intention to buy a new tub but they never got around to it. MIL turned up one day and decided it could be cleaned – between her efforts and those of WM the tub looks pretty good!
  4. Some of the vinyl tiles on the laundry floor were damaged – WM lifted them and replaced them (hurrah for being able to match the tiles; thanks Bunnings! – a large hardware chain in Australia)
  5. There once were shelves and unused brackets on the laundry wall. All the shelves have been removed (for painting) and the holes filled and sanded. Not too much can be done here, the walls are made of a fibro that contains asbestos and would need professional removal.
  6. 79yo MIL washed all the windows and venetian blinds in the family room. This photo shows slightly more than half of them! WM has installed a new light fitting on that bare wire!
There will be more before and after photos in a later post!

Right now, I’m off to have lunch then trim my quilt sandwich, press fabric, cut and join binding strips, attach binding and stitch it down – it doesn't sound like much if I type really fast! Winking smile

Thursday, 7 March 2013

2013: the Year of the Finished Project -- March

The second half of February was a non-crafting fortnight for me. Apart from attending my weekly quilting class and knitting some hats for the local hospital's neo-natal unit, I did almost no knitting, and no sewing of any kind!
There is a reason for all of that but this post is not the place for sharing what I can of my family situation.
This is the place to review last month’s goals and publish new plans for the month of March which, I’m sure, you are already working towards given that the first week of the month is already behind us!
Please link below with the URL of your review/goals post (not just your blog URL).
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Here is the list I wrote for February:
  1. Ben's birthday surprise – every time I tried to work on this I just couldn’t; I didn’t think he would like it so I didn’t devote any time to it!
  2. Westall cardigan  – managed to knit a few rows and am about half way through the bottom ribbing.
  3. Black Stump Creek quilt  – finished 9 February; there will be a separate post about this tomorrow (I hope)
  4. hexagon project bag  – didn’t touch it
  5. Scrappy Log Cabin quilt – didn’t touch it
  6. Earth and Sky quilt – didn’t touch it
  7. Deb's Diamond Blanket  –  didn’t touch it during February, this is a long term project  
  8. placemats for the Grandsons – this was to have been my new project for February and I could have started it because I had finished two quilting projects since 1 January but, like everything else, I didn’t touch it!
  9. piano cross stitch – didn’t touch it
Here is what I hope will be a reasonable list for March (although the first seven days are over and I still haven’t done anything!):
  1. Earth and Sky quilt – WIP – at this stage it’s still separate blocks, by the end of March I plan for a finished quilt
  2. Scrappy Log Cabin quilt – UFO – at this stage it’s a flimsy requiring a border, by the end of March I plan for a finished quilt
  3. Scrappy Strings II quilt – UFO – at this stage it’s a too big flimsy with a too big backing, by the end of March I plan for a finished quilt
    quilt top finished
  4. at least one quilt for Blankets With Love – this will be my new project for March
  5. Westall cardigan – WIP – finish ribbing, knit sleeves
  6. hexagon project bag – WIP – my “slow stitching” project
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Thursday, 7 February 2013

2013: the Year of the Finished Project – February

Never Too Hot to Stitch!
How did you go in January?
What plans do you have for your UFOs/WiPs in February?

Write your post which answers these two questions (you can be as expansive – or not – as you like). Then join up with the linky party below. Please remember to use the URL of your specific post, not just your blog URL. Thanks.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~
January was a hectic month for me. Not only did I have house guests until 9 January, then overnight guests on 22 January, I put enormous pressure on myself to “get things done”!

You see, our quilting group has the “Airing of the Quilts” on the second weekend in April. I was asked towards the end of last year how many quilts I would be contributing and I said six. It seemed reasonable at the time! However, I started 2013 with only one finished quilt so I planned to finish two in each of January and February, and the fifth in March. Easy-peasy, right?

Well, putting pressure on myself means I tend to rush a little and don’t notice things – or I ignore the things I do notice! The second quilt I intended to finish in January was quilted. The binding was cut and ironed and ready to go. But there I stopped!

I think the top of the quilt was not pulled tight enough when I basted and it looks “wrong” now that the quilting is done. Deep down, I wanted to pull out all those quilting stitches and start all over again. But no-one wants to do that in reality! So there I was, torn because the quilt was so close to being finished and wanting it to look better than it does! Will more quilting fix the problem? Perhaps!

Look at the bunching of the fabric around the brown square on the left and the green square in the centre right. Look at the wrinkles in the light brown fabric of the four patch between them!
P1300090
It didn’t help that the border fabric I chose, which looked so right to begin with, has changed the quilt from looking quite sophisticated (which I loved)  to looking more frivolous! 2013 borderless flimsyP1300092
Fortunately, my quilting class resumed on Monday (after our seven-week summer break). I asked for my teacher's opinion. Whatever she recommended I would have done. The good news is that she told me it was fine and to get it bound and done! So the binding was added during class.

I'm a bit concerned about the backing fabric now though -- look at my sewing machine:

Remember this backing fabric I showed you last week:
The founder of our community quilting group doesn't like us to wash quilts when we're finished them, she likes the pristine look for exhibition but I think I'm going to have to wash this with a packet of colour catchers! I know the quilts are taken down at the end of the exhibition and stored, then a few weeks later they are sorted and distributed to the local hospitals and other charities. I can't let this one go while it's leaking this much dye! Imagine the mess if it got wet!

So, my January list looks like this:
  1. Westall Cardigan – I am currently knitting the bottom ribbing. I then have sleeves and the front band to go. I should have it finished by the end of February but would like it sooner!
  2. sideways baby jumper – started November 2011 -- to be finished by end of the month -- frogged 6 January 2013
  3. Deb’s Diamond Blanket – I didn’t work on this at all during January; all my knitting time was spent on the Westall cardigan, except when I had company and then I was working on plain self-striping socks!
  4. Squares quilt – blocks made, the layout planned (done 10 Jan), and the blocks sewn into rows by the end of January (done 15 Jan); this is the quilt mentioned above. As you can see, I reached my progress goals by the fifteenth of the month; it was in pushing myself to get it done by the end of the month that things fell apart!
  5. Dotty Bright quiltfinished 25 January (yahoo! a real finish!)
  6. hexagon project bag – I didn’t touch this during January
  7. piano cross stitch – I didn’t touch this in January
  8. placemats for the Grandsons – this was to have been a new project but, because I am drowning in unfinished projects, I’ve given myself a two-for-one deal: finish two quilting projects and you can start another! Because that squares quilt is not finished, the placemats have to wait! As Shakespeare said, “to thine own self be true!”
So, do you think I will go easier on myself in February?
Here’s my list – what do you think?
  1. Older Grandson’s birthday surprise  – UFO
  2. Westall cardigan  – WIP – ribbing, sleeves and band
  3. Black Stump Creek quilt  – WIP 
  4. hexagon project bag – WIP
  5. Scrappy Log Cabin quilt – UFO – border, backing, bating, quilting, binding
  6. Rainbow improv quilt – WIP – layout, joining blocks into rows and rows into top; I think I’ll be content if I get to completed flimsy!
  7. Deb's Diamond Blanket –  WIP –  will not be finished this month, this is a long term project 
  8. placemats for the Grandsons – this will be my new project for February but first I have to get one more quilting project finished!
  9. piano cross stitch – UFO -- if I do a little on this every month, I may get it finished sometime this decade!
So, what about you? Did you meet your goals for January?
Are you, like me, pushing yourself too hard?
And what are your goals for February (are they realistic?)


Wednesday, 16 January 2013

progress is being made

The 16th, being exactly in the middle of the month, seems like a great time to share progress on my January focus list.

So far I have worked on only three of the eight items on my January list

But I am happy with that, considering I had house guests until 9th January.

I have cast on another pair of socks -- these don't interfere with my Year of the Finished Project. Plain stocking stitch socks, single-coloured garter stitch squares, class samples/projects and rainbow scrap quilting blocks are exceptions and are not counted as new projects.

You will no doubt notice that the toe of the first sock has not yet been grafted. That's because it's easier to cast on for another sock while in the car than to try grafting while in a moving vehicle! 

Socks make great travel knitting: they are small and easily transported, they don't lie in my lap when the temperature outside is over 35°C (95°F), and because they are knit in the round on dpns are only ever sixteen stitches from the "end of the row"!

Many of you would have read that my first "finish" of the year was to "frog" (rip out) a baby sweater I started in November 2011 because I thought the head hole was too small after I knitted the collar on. That's one thing off my Focus list, even if not the way I originally intended.

My "big" knitting project is the Westall cardigan that I am making for myself. I planned to be up to the waist shaping a few days ago but had to extend that deadline to yesterday because the cotton/acrylic yarn, while knitting up into a nice soft fabric, is hard on my hands so I can only do a few rows before I have to take a break.
knitted from the top down, back and both fronts at the same time

I did reach yesterday's deadline and have started the waist shaping but I'm beginning to have my doubts about having this finished by the end of the month! Nevertheless, I will persevere, I will soon be up to the plain stocking stitch part of the body so it should go a little faster then!

And on the quilting front, I started thirty-two square-on-square blocks last Friday and finished them on Monday (I had no time for sewing over the weekend). I only needed thirty-one but it doesn't hurt to have one extra, just in case. Yesterday I sewed the blocks into rows and the rows into a flimsy, so I have met my goal for January for this project and need to turn my attention to other projects while I think about the borders for this one.


I think I'll use a thin blue solid inner border but I'm not sure about the outer border. Strips (piano keys) with corner stones?

Time to baste this baby, I think. Eight months in the waiting pile is long enough!

So, how about you? How are you going with your January goals?

Linking up with WIP Wednesday over at Freshly Pieced (hosted by Lee).
WIP Wednesday at Freshly Pieced

Monday, 31 December 2012

December and 2012 review


 During the second half of this year, I decided to focus my attention on a small number of projects (maximum 7) and not allow myself to be distracted by my UFOs or enticing new projects.

This is my progress during December which shows that I really do work best when I have a short list of projects to focus on!
  1. The Very Hungry Caterpillar quilt (finished)
  2. Christmas Tree wall-hanging (finished)
  3. Cardigan for Me (some progress)
  4. Purple Dropped Stitch Scarf (finished)
  5. Merlot Toe Up Sock (finished)
  6. appliqué blocks (finished)
  7. Scrappy Rainbow “hearts and four-patch” quilt (some progress)
I knew there was no way that I would have that cardigan or quilt finished in December; as long as I am making progress, I'm happy.

Here's the final photo of the Purple Dropped Stitch Scarf  -- taken before it was washed and dried to soften it up.
2012 purple dropped stitch scarf
Nitty-Gritty (for those who like such things)
yarn: Panda Magnum 8ply (DK) 100% acrylic; used all but two metres of the 310 in the skein!
purchased at H. Fay and Sons, Bingara
needles: 4.00mm Aero circulars (60cm long) - purchased at David Jones at least 30 years ago!
time taken: 14 days
length and width of scarf: 6" x 72"


~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
The short "focus list" came into being after I published a list of twenty-six WiPs  -- some quilting, some knitting. That was June and I was overwhelmed by the number of things I was trying to work on.

I have come to realise that the longer I leave a project the less likely it is to get finished -- which I guess is probably true for everyone!


To keep it "short", this is a list of the UFOs and WiPs I carried into 2012, and the progress I made on them; plus the projects I started during 2012 which are not yet finished. I have not included the 55 projects I started and finished during 2012 (85% of them knitted).
  1. piano cross stitch (started 1995) – UFO
  2. Stealth Knitting Project (started January 2010) – UFO
  3. Ambassador of Love mittens (started March 2011) – UFO
  4. Country Houses Quilt (started May 2011) – UFO
  5. Lace Infinity Scarf (started June 2011) – frogged August 2012
  6. sideways baby jumper (started November 2011) – UFO
  7.  Safari Cloth Book (started November 2011) – finished October 2012
  8. curtains (started November 2011) – embarassingly -- UFO
  9. Scrappy Strings quilt (started November 2011)  – UFO
  10. Rainbow Scrap Challenge applique heart blocks (started October 2011) – finished December 2012
  11. Rainbow Scrap Challenge four patch blocks (started November 2011) – worked on the last couple of months, so a work in progress
  12. Rainbow Scrap Challenge nine patch blocks (started November 2011) – worked on the last couple of months so a work in progress
  13. Rainbow Scrap Challenge string blocks (started November 2011) – worked on the last couple of months so a work in progress
  14. Rainbow Scrap Challenge improv blocks (started November 2011) – worked on the last couple of months so a work in progress
  15. Rainbow Scrap Challenge Wonky Window blocks (started November 2011) – worked on the last couple of months so a work in progress
  16. purple Cocoon socks (started September 2011) – I can’t make up my mind whether to knit or frog – UFO
  17. soft blue socks (started September 2011) – finished July 2012
  18. Merlot toe up socks (started September 2011) – finished December 2012
  19. intarsia blanket (started November 2011) – finished November 2012
  20. Tina’s baby blanket (started January 2012) frogged July 2012
  21. Super Secret Project for Ben (started February 2012) UFO
  22. Dotty Bright (started April 2012)  – made it to the quilting frame but nothing ever happened – UFO
  23. Scrappy Log Cabin (started April 2012) – no action (only thought) since June – UFO
  24. sampler quilt (first block cut May 2012) – never really got off the ground so it’s not really a WiP or a UFO, in 2013 it will be like a new project!
  25. donated partial scrappy string quilt #1 (started May 2012) – UFO
  26. donated partial scrappy string quilt #2 – no longer exists, it has been reclaimed as scraps for the Rainbow Scrap Challenge – frogged November 2012
  27. hexagon project bag (started in September) – work in progress
  28. Deb’s Diamond blanket (started November 21) – work in progress
  29. Westall Cardigan (started 27 November) – work in progress

During 2012, I finished a total of 60 projects; three projects were frogged, one project never got started, eight remain works in progress and ten have slipped into being UFOs (I think six months without any action is long enough to call them unfinished objects)! 


That's twenty two projects being carried into the New Year! And twelve of those were started before 2012!

It's not a long list but, for the sake of my sanity, 2013 needs to be “The Year of the Finished Project”!Year of FP button

Wednesday, 19 December 2012

works in progress (or not)

Warning: poor quality photos – I had to use my iPad because my camera batteries were all flat!
~~~~~~~~~~~~~~~~
At the beginning of December, I published a list of my December WiPs. It looked like this:
  1. The Very Hungry Caterpillar quilt
  2. Christmas Tree wall-hanging
  3. Cardigan for Me
  4. Deb’s Diamond Blanket
  5. Merlot Toe Up Sock
  6. hexagon project bag
  7. Scrappy Rainbow improv quilt
Then came the fiasco which was my packing of craft activities for my week away.

But I did manage to finish the second Merlot Toe Up Sock while I was away. Not having my basic knitting tools with me meant that I had to wait to sew the ends in till I came home!
I also mentioned that I took my appliqué heart blocks away with me instead of the hexagon project bag that was on my original WiP list. With stitching time on the train, at embroidery class last week and sewing class this week, I have managed to finish the appliqué on the last few blocks (three of which are shown here).
The ten-hour travel time also gave me a chance to think about the setting of these blocks. I am going to try setting them alternately with the four patch blocks I have made for the Rainbow Scrap Challenge, and use the Rainbow String blocks for a piano-key-style border. Well that's the theory anyway!

An incredibly busy and tiring week followed my return home – I am so tired that I don’t have the energy for most craft activities and so fall back to my good old stand-by: knitting.

I have done a little on the right front of my cardigan.
But this lace pattern, as easy as it is to memorise, requires concentration. I can’t knit it when there are people around!

And so, I have been working on the Drop Stitch Scarf I started while away. I don't really have to think, except to count the yarn overs in one row out of four.
The scarf is progressing quite quickly considering my lack of enthusiasm for this project – the acrylic yarn is not pleasant to work with!

And so my list now looks like this:
  1. The Very Hungry Caterpillar quilt (no progress)
  2. Christmas Tree wall-hanging (today’s project)
  3. Cardigan for Me (some progress)
  4. Deb’s Diamond Blanket replaced with Purple Dropped Stitch Scarf (much progress)
  5. Merlot Toe Up Sock (finished)
  6. hexagon project bag replaced with appliqué blocks (finished)
  7. Scrappy Rainbow improv quilt replaced with Scrappy Rainbow “hearts and four-patch” quilt
Just as well I realised at the beginning of the month that there was no way I was going to get all these finished by the end of the month. The list was supposed to focus my activities and, despite my swapping some projects for others, I have managed to stay focused and achieve some progress. At least I swapped and didn’t just add to the list – six or seven is the limit; after that I become overwhelmed!






Wednesday, 5 December 2012

WiPs on Wednesday

Today I am travelling to my mum’s place. She is having the cataract removed from her other eye on Friday and I am going to be with her until Monday. Please pray that it doesn’t rain in or near the township of Moree like it did last year! You may remember that we became trapped by floodwaters for several days in November last year.

~~~~~~
I am slowly working through the long list of WiPs that I published in June and July but the list just seems to get longer as new projects somehow find their way into my craft room! In fact, only two of the seven projects listed here are on that list!

The things that I am concentrating on this month are:
  1. The Very Hungry Caterpillar quilt
  2. Christmas Tree wall-hanging
  3. Cardigan for Me
  4. Deb’s Diamond Blanket
  5. Merlot Toe Up Sock
  6. hexagon project bag
  7. Scrappy Rainbow improv quilt

I don’t know if I’ll get any time to work on that last item. Being away from home for nearly a week plus Christmas activities plus family visiting will cut into my crafting time. Some of these items will not be finished in December: this is just my “focus group”!

Very Hungry Caterpillar Quilt
I am making this quilt for my niece who is expecting her first child in March/April. I just have to sew down the binding and add a label and it will be done! I've not labelled my quilts before: tell me please, what does one write on the label when one doesn’t know the name or the sex of the baby, or even which parent’s surname he/she will have? I guess I could just write “Made with love by Great-Aunty Lynne 2012”. Thoughts?
2012 binding on2012 top close up after quilting
There is no stain on the quilt top – that is the light shining through the dotty fabric on the back. You can see the backing here if you haven’t seen it before.

Christmas Tree Wall-Hanging
It would be really good if I could get this finished and hanging before Christmas. You have seen these three embroideries separately but here they are all together. The one on the right is the one I finished today.
2012 three Christmas tree blocks

Cardigan for Me
After much deliberation over patterns, I have chosen to knit the Westall Cardigan (Ravelry link) for me! As I said in this post, I had a bit of trouble getting gauge, which is nothing unusual for me. I finally got within half a stitch using 3.00mm needles instead of the recommended 3.5mm. For those who don’t knit, there are a lot of consequences to not getting the gauge right – the size of garment can be dramatically altered and a loosely knitted garment can stretch beyond redemption after being washed. On the other hand, a garment which is knitted too tightly will strain and pull, and the knitted fabric could pill and wear out much more quickly than would otherwise happen. Worst of all, after hours of knitting and tens of thousands of stitches, it might not fit its intended wearer!

This particular pattern has an unusual construction; it is knitted from the top down, back first then both fronts at once; all three pieces are then joined below the armholes and the rest of the garment is knitted in one piece. It has a gorgeous lace pattern which is relatively simple to knit. This is how much I have knitted since I cast on last Tuesday (27 November). I am up to the armhole shaping of the back and will then go back and pick up the stitches for both fronts from the provisional cast on (that light blue yarn at the bottom of the photo).
2012 Westall cardigan 68 rows in2012 Westall cardigna stitch pattern
 Deb’s Diamond Blanket
After taking twelve months to knit the Intarsia Blanket, I have designed my next blanket project. It is called Deb’s Diamond Blanket and was inspired by this string quilt made by my friend Debbie at Stitchin’ Therapy blog.

My knitted design calls for 112  x 5” (12.5cm) squares which I will join as I go (and sew the ends in – I learnt my lesson from the last blanket). This is how much I have knitted since I started the project on 21 November.  This will be a ten inch square when completed. (3 down, 109 to go!)
2012 Deb's Diamond blanket 3first three squares
 Merlot Toe Up Socks
Neither of my two large knitting projects are ideal for travelling or for knitting in company so I have cast on the second Merlot Sock to take with away with me. I cast on for the first one in September 2011 and would have finished it within a couple of weeks! I wondered why I had put it off for so long but I soon realised while doing Judy’s Magic Cast On on 2.25 (US 1) double-pointed needles -- I don’t like doing this cast on this way. It’s easier on circular needles – but my sock knitting circular needles are otherwise occupied. Obviously I did get it done in the end but it was tricky and annoyingly difficult. Either I’ll use my circulars or stick to cuff down socks for donation knitting in future!
2012 Merlot toe up socks 2nd sock in progress
For those who wonder about such things, I am doing 72 stitches and an hourglass heel (from Lynne Vogel's Twisted Sisters' Sock Workbook)

 Hexagon Project Bag
It seems like a long time since I started my Hexagon Project Bag with so much enthusiasm – a quick check of my blog shows that was only September but it feels much longer ago than that. I still need to cut out six pentagons (I didn’t realise that until yesterday) and six half hexagons and tack them down. Yesterday my sewing teacher showed me hoe to join the hexagons so I’ll see how much weight I have in my bag – if I have enough room I can take them as they’ll make a nice change from knitting. There are 36 hexagons in this photo, believe it or not!
2012 40 hexagons
Do you like my storage container? For what purpose would one use an old 70’s Tupperware container with a cracked lid if not for craft storage? LOL
2012 biscuilt hexagon barrel
The bottom two hexagons are the two my teacher joined as a demonstration.

Scrappy Rainbow Improv Quilt
I have more than enough improv blocks to make a quilt top and have bought some fabric to use as sashing – solids in natural and sand; I can't decide which to use yet till I get the blocks up on the design wall. I enjoy the improv block process so I will be making more I’m sure! They also make a good “leader and ender” project (if I ever remember!).

There are 99 x 6.5” blocks in this pile! I'm not sure where the red ones are hiding!
2012 99 improv blocks

What are you working on? Do you still have projects you need to finish before Christmas?

Hopefully linking up with WIP Wednesday over at FreshlyPieced blog


Monday, 26 November 2012

Does gauge matter?

Answer: It depends on what one is knitting!

I have not knitted a garment for myself in a very long time. I know I knit to a loose tension (gauge) but this might be a little too loose!

I got 18.5 stitches to 10cm, the pattern calls for 24 stitches.

If I had just gone ahead and knitted this cardigan, the first time I washed it I would have a cardigan for a silverback gorilla! The yarn is 50% cotton/acrylic blend so the actual yarn shouldn't stretch too much (don't worry, I'll do a test wash before committing to a whole cardigan) but a difference of 5.5 stitches over 10cm will be a massive difference on my XL frame!

Obviously my retirement from paid work and being an empty-nester combined with a renewing of my commitment to my God (resulting in a revived spiritual life) has made me very relaxed indeed!

Posted from the Blogger app on my iPad using a photo taken with the iPad

Saturday, 1 December 2007

Still here, still knitting, still tired!

More than a month since my last post! Thanks to those bloggers who contacted me to see if I was okay. Where have I been? Well, the redecorating continues but living in a constant state of mess is really getting to me!

Work has also kept me very busy - the more volunteers, the more preparation I have to do to keep them all busy!

But, all is not lost - I have been knitting. Clapotis is finished and blocked. I may even be able to convince WM to stand still long enough to take photos then I can post them here and post the real thing to its recipient.

I have also made two 'scrap' cardigans; one is completely finished, the other is at the finishing stage. Again, hopefully photos this afternoon.

As for socks, the less said the better. Apparently they don't feel comfortable because they are too big! So the finished pair and the almost finished pair need to be ripped out and started again! :-(

Sad to say, the socks will have to wait - so much for SSoS. I'm giving up knitting for a month! My shoulder isn't getting any better and I want to see if knitting aggravates it [or not knitting helps!].

What's a girl to do?

Friday, 23 March 2007

The cardigan that never was Part II

Today I had another look at that cardigan. At first, I couldn't find the hole that I knew was in one sleeve. Finally I found a hole - near the armhole shaping, not near the cuff as I remembered. Perhaps I had been holding the sleeve upside down.

"Great," I thought to myself, "I can pull out those few rows, and reknit them. Then I'll give the cardigan to mum, she loves the colour and she'll really appreciate it."

The frogging was easy, picking up the stitches wasn't too difficult, but then, to my horror (and a lesson learnt, I hope), I couldn't find any notes in my journal about what size I was knitting, which needles I had used, etc! The size wasn't too difficult - I counted the stitches in the cuff ribbing and looked at the pattern book. Hmm, two sizes with the same ribbing. I counted the stitches in the ribbing on the back - ah, that's the size!

Because it's a dark colour it was difficult to tell where I was up to in the textured pattern but I finally worked it out - now all that remained was to do a swatch to find the needle size, and to work out how many rows still to go before commencing armhole shaping. I checked it once more with the other sleeve, and, to my horror, there was the original hole - big enough to pass a pingpong ball through - near the cuff of the second sleeve, in the part where the stocking stitch curled under.

I ground to a halt! Should I knit both sleeves again? Or, since I'm not entirely happy with the textured pattern, should I pull out the whole cardigan and start again? Or maybe use the wool to make something else? Pulling out the whole cardigan will at least show me where wool has been damaged by those pesky little insects - even if there is no apparent hole (yet)!

Stay tuned for the continuing saga of the The Cardigan that Never Was!